trans-o-flex, Weinheim

professional warehouse management

Efficient, route optimized, and profitable

New distribution center for trans-o-flex

04 7 4

Logistics services

Outsourcing solutions for logistics services are in demand. More and more companies are choosing to place their storage, packing, picking, and packaging in the hands of specialists. Founded in 1971, trans-o-flex Schnell-Lieferdienst GmbH & Co. KG in Weinheim, Germany, is one of the leading combi-freight service providers for parcel and pallet shipments. The portfolio includes professional full-service warehouse management.
With over 100 employees at six locations, trans-o-flex offers its customers tailored warehouse management.
The new warehouse is being used exclusively to store promotional material for the pharmaceuticals industry and promotional sales products, with around 2000 pharmaceutical reps receiving regular deliveries from the distribution center. At peak times, 1400 shipments with 2500 packages leave the warehouse every day.

 

ref logistik 14 7 01
[Translate to Sverige:] The pallet racking store is designed for 9000 pallets.

Project details

Object: Distribution center
Size of warehouse: 5000 m²
META products installed: META MULTIPAL S pallet racking system
META steelwork platform with two-tier META QUICK shelving system

The task

The facility originally had four bays. These bays were gutted, the partitions were removed, and the floor was stabilized. The planning objective was to shorten routes and increase the storage area.
In practice, the pallet racking system provides direct access to the access stations of the multi-tier system. The benefits of this system are the quick access and simple arrangement of transfer points.

[Translate to Sverige:] The 860 m² platform and 72 props support a two-tier shelving system with 5000 shelves.
trans o flex personen
[Translate to Sverige:] Peter Astor, Customer Solutions department and Rainer Dalecke, Operations Management

Customer statement

“In META we have found a fulfillment provider that not only ideally meets the concept requirements but takes time to refine details and constantly develops suggestions for improvement until the result ensures perfectly streamlined processes,” says Rainer Dalecke as he describes the collaboration with META.
“The 3-week installation time was outstanding. From the very first day, each of the six or so fitters knew what they had to do – everything went without a hitch,” says Operations Manager Dalecke.