Huber

Austria
/data/META AT Huber Transporte 2025 LQ 01 komp

Huber

Austria

Central warehouse for spare parts and equipment - with efficient use of space and a structured storage solution

Two-storey shelving racking system, structural steel platform with staircase and pallet transfer station, pallet racking at Huber in Mürztal, Austria.

Check icon
Customer
Johann Huber Spedition- und Transportgesellschaft m. b. H. (Mürztal, Austria)
Check icon
Project
Spare parts warehouse
Check icon
Industry
Logistics
Check icon
Stocked goods
Own equipment and spare parts
Check icon
System
META MULTIPAL pallet racking, META CLIP shelving, steel construction platform with stairway and pallet transfer station
Dr. Johann Huber, CEO Huber Spedition- und Transportgesellschaft

"At the beginning, we were faced with the challenge of planning our spare parts warehouse and, to be honest, we didn't know exactly how to go about it ourselves. This made the collaboration with META all the more valuable: together we developed a solution that is not only functional but also efficient. The available space is used optimally, the distances are short, the structure is well thought out and space-saving.

We were particularly impressed by how constructive and solution-oriented the planning was. We were able to incorporate our requirements and at the same time received a lot of helpful input from META. The implementation also worked extremely well. Whether it was a question of special detailed solutions or requirements such as overnight delivery - everything was taken into account and implemented professionally. From the first meeting to the final implementation, the collaboration was consistently positive and based on partnership."

Uwe Zrim, Technical Sales META Austria

"In 2023, the warehouse manager of Huber Transporte, a logistics and transport company as well as a truck workshop, approached us with a request for a new warehouse solution.

The planning phase lasted just over six months. Together, we discussed what was needed, what was still in the old warehouse - which was now being demolished - and what should be added. This included new crates in the lower area and many small details.

Overnight deliveries were a particular challenge. Because of the high-quality goods, we had to plan for barriers."